The installation and connection of high pressure pulverizer involves several steps. Here are some general guidelines for the installation method and connection method:


1. Foundation preparation: The foundation should be level, stable, and able to support the weight of the equipment. The foundation should be made of concrete or other durable materials.


2. Installation of main unit: The main unit of the high pressure pulverizer should be installed on the foundation. The installation should follow the manufacturer's instructions and use appropriate tools and equipment.


3. Connection of pipelines: The pipelines for water, air, and oil should be connected to the pulverizer according to the manufacturer's instructions. The connections should be tight and secure to prevent leakage.


4. Electrical connection: The electrical connections for the high pressure pulverizer should be in accordance with local regulations and the manufacturer's specifications. The electrical components should be properly grounded.


5. Commissioning: After installation and connection, the high pressure pulverizer should be commissioned to ensure proper functioning. The commissioning should follow the manufacturer's instructions and include checking the equipment for leaks, vibrations, and abnormal noises.


Here is a table summarizing the installation method and connection method of high pressure pulverizer:


| Step | Description |

|------|-------------|

| Step 1 | Foundation preparation: The foundation should be level, stable, and able to support the weight of the equipment. |

| Step 2 | Installation of main unit: The main unit of the high pressure pulverizer should be installed on the foundation. |

| Step 3 | Connection of pipelines: The pipelines for water, air, and oil should be connected to the pulverizer according to the manufacturer's instructions. |

| Step 4 | Electrical connection: The electrical connections for the high pressure pulverizer should be in accordance with local regulations and the manufacturer's specifications. |

| Step 5 | Commissioning: After installation and connection, the high pressure pulverizer should be commissioned to ensure proper functioning. |


Please note that these installation and connection steps are only for reference and may vary depending on the specific situation. It is recommended to consult with a qualified engineer or industry expert for a proper analysis of installing and connecting a high pressure pulverizer.